Wednesday 11 December 2013

DIGGING A NEW POND OR BUILDING A CONCRETE OR BLOCK TANK?


Are you intending to dig a new fish pond or clean up an existing pond?

Many farmers have had the misfortune of contracting people to dig or clean up their ponds and they simply disappear and abandon the job halfway for very funny reasons.

PRA and C are professional pond and concrete or block tank makers and can dig a 5m by 5m pond in less than a week for GHS250.

Their charges are GHS10 cubic meter. A little negotiation comes in if the soil is clearly the difficult type after they test but you can be guranteed cheap prices than any team or excavator would offer.

What you get: 

  • A pond with sloping for no extra cost
  • Well shaped pond edges
  • Delivery on time
PRA and C are based in Agona Swedru but travel widely to execute contracts. If you can provide or arrange some rudimentary accomodation before hand they would greatly appreciate it.

Also, clients have to facilitate their transportation to the site for evaluation of the soil and water retention.

Find below a video of them at work in Takoradi building a 5m by 10m tank with 6inches block.


No comments:

Post a Comment